55 St. Clair Ave West
Lobby Demolition & Renovation
Toronto, ON
Label
Commercial
55 St. Clair Ave West
Pre-construction
Budgets and Value Engineering
Design-Build
Construction Management
5,000 SF
Demolition and renovation of the existing lobby area.
- Selective demolition
- Restructure and configuration of the existing concrete floor
- Accessibility upgrades
- Finishes and Millwork
- Mechanical and Electrical
![](https://cdn.prod.website-files.com/640a211ea01d26208d9635e6/648b24f1456769a904555fe6_55.jpg)
![](https://cdn.prod.website-files.com/640a211ea01d26208d9635e6/648c7e715dab4cf8551817e3_IMG_1820.jpg)
![](https://cdn.prod.website-files.com/640a211ea01d26208d9635e6/648c7e714434b314d444e85e_IMG_1823.jpg)
![](https://cdn.prod.website-files.com/640a211ea01d26208d9635e6/648c7e717062283d7ce4d5ca_IMG_1824.jpg)
![](https://cdn.prod.website-files.com/640a211ea01d26208d9635e6/64c26b56517bb9b376c7f39e_e6155624-9597-488c-ad6c-20ae6f9dcf77-w.jpg)
![](https://cdn.prod.website-files.com/640a211ea01d26208d9635e6/64c26b5724f31f27bf648e18_IBIstclairLOBYb5s-compressor.jpg)
No items found.