Chiller Replacement and Mechanical Upgrades

Toronto, ON
Label
Type
Facilities
Location
2 St. Clair Ave East
Services
Pre-construction
Construction Management
Design-Assist
Budgets and Project Optimization
Project Size
Not Applicable
Accolades

Reliable building performance begins with dependable mechanical infrastructure. At 2 St. Clair Avenue East, the existing chiller system was replaced alongside associated mechanical upgrades to improve efficiency, reliability, and long-term operation within the building.

Careful coordination allowed the work to be completed in an occupied environment while minimizing disruption and strengthening the performance of this critical building system.

‍

‍

No items found.
Contact

Get started with us

We would love to work with you. Tell us a bit about your project to get started.
Get in Touch
Get in Touch