Chiller Replacement and Mechanical Upgrades
Toronto, ON
Label
Facilities
2 St. Clair Ave East
Pre-construction
Construction Management
Design-Assist
Budgets and Project Optimization
Not Applicable
Reliable building performance begins with dependable mechanical infrastructure. At 2 St. Clair Avenue East, the existing chiller system was replaced alongside associated mechanical upgrades to improve efficiency, reliability, and long-term operation within the building.
Careful coordination allowed the work to be completed in an occupied environment while minimizing disruption and strengthening the performance of this critical building system.



No items found.